Remove Approach Remove Descent Remove Wind Shear
article thumbnail

NTSB: Pilot Was Flying Too Low Before Hitting Smokestack in Idaho

Flying Magazine

The NTSB released its final report into the fatal April 2022 accident that occurred when the pilot was on approach to Burley Municipal Airport (KBYI). The standard for airspeed after passing the final approach fix was 120 kias indicated, according to the Flight Maneuvers Description Manual (FMDM).

Pilot 122
article thumbnail

B-1B bomber accident at Ellsworth AFB caused by crew errors, unhealthy culture

Aerotime

The aircraft touched down about 100 feet (30 meters) short of the runway, causing the rear radome to strike the ground and the main landing gear to hit the approach lighting system. The incident occurred while the crew was conducting a low-visibility approach through dense fog. The mishap led to the crew ejecting from the aircraft.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

How to Brief an Instrument Approach (Step-by-Step)

Pilot Institute

For new instrument pilots, flying an approach to minimums is a big challenge. Adding an approach briefing to the mix feels like one task too many. Luckily, mastering approach briefings is not as hard as it seems. This article breaks down how to deliver a top-notch approach briefing, every time. Final approach course.

article thumbnail

Invisible Trap Kills Glider Pilot – How To Avoid Microbursts

Chess In the Air

Moderate wind shear in some areas could make some thermals somewhat difficult to work but that, too, is typical. Approaching Rifle The last six minutes of Shmulik’s flight are plotted on the following map. This would have shortened his approach, a seemingly prudent decision. to 2 miles) in diameter.

Pilot 52
article thumbnail

How to Perform a Go-Around (The Right Way)

Pilot Institute

A bad approach results in a bad landing. A go-around is a maneuver performed to abort or reject a landing on the final approach or once the aircraft has already touched down. Top Reasons for Go-Arounds Unstabilized Approach An aircraft must have a stabilized approach before landing. What Is a Go-Around?

article thumbnail

Sweet Dreams

Photographic Logbook

I expected minimal IMC time and the need for an approach appeared beyond remote. The Inevitable Reroute Allentown Approach: "Cherokee Four Eight One, I have an amendment to your routing, advise ready to copy." Right after I saw the city, I was vectored away from it to the northeast and cleared for the approach. Foolish mortal.